Post by caldridge on Mar 7, 2011 5:47:44 GMT -5
Has anybody heard of Hinkley Point Power Station?
It is near Bridgwater, Somerset. The pylons at Semington, where I live start here. All pylons at Hinkley Point are L2s. There's two 400kv lines and one 275kv one.
Here's some 400kv L2 pylons, these are the pylons that head through Semington, they head to Melksham Substation, Wiltshire.
i1222.photobucket.com/albums/dd486/cmaldridge/DSCF2809.jpg
Here's some 275kv L2 pylons, these pylons head to Bridgwater Substation.
i1222.photobucket.com/albums/dd486/cmaldridge/DSCF2810.jpg
i1222.photobucket.com/albums/dd486/cmaldridge/DSCF8653.jpg
The 275kv pylons have shorter insulators than the 400kv ones.
i1222.photobucket.com/albums/dd486/cmaldridge/DSCF2811.jpg
Looking the other way. The pylons heading from the power station.
i1222.photobucket.com/albums/dd486/cmaldridge/DSCF2812.jpg
i1222.photobucket.com/albums/dd486/cmaldridge/DSCF8656.jpg
i1222.photobucket.com/albums/dd486/cmaldridge/DSCF2813.jpg
Here's some more 400kv L2 pylons. I have no idea where these pylons head to.
i1222.photobucket.com/albums/dd486/cmaldridge/DSCF8663.jpg
Joining the other pylons.
i1222.photobucket.com/albums/dd486/cmaldridge/DSCF8659.jpg
All three lines heading from the power station. 400kv (left & right), 275kv (center).
i1222.photobucket.com/albums/dd486/cmaldridge/DSCF2814.jpg
Looking back from the power station. The pylons going off in different directions.
i1222.photobucket.com/albums/dd486/cmaldridge/DSCF2817.jpg
The terminal towers. The 275kv pylons start there in the field, but the 400kv pylons start back at the power station.
i1222.photobucket.com/albums/dd486/cmaldridge/DSCF2818.jpg
i1222.photobucket.com/albums/dd486/cmaldridge/DSCF2816.jpg
i1222.photobucket.com/albums/dd486/cmaldridge/DSCF8670.jpg
Enjoy!
Christopher
It is near Bridgwater, Somerset. The pylons at Semington, where I live start here. All pylons at Hinkley Point are L2s. There's two 400kv lines and one 275kv one.
Here's some 400kv L2 pylons, these are the pylons that head through Semington, they head to Melksham Substation, Wiltshire.
i1222.photobucket.com/albums/dd486/cmaldridge/DSCF2809.jpg
Here's some 275kv L2 pylons, these pylons head to Bridgwater Substation.
i1222.photobucket.com/albums/dd486/cmaldridge/DSCF2810.jpg
i1222.photobucket.com/albums/dd486/cmaldridge/DSCF8653.jpg
The 275kv pylons have shorter insulators than the 400kv ones.
i1222.photobucket.com/albums/dd486/cmaldridge/DSCF2811.jpg
Looking the other way. The pylons heading from the power station.
i1222.photobucket.com/albums/dd486/cmaldridge/DSCF2812.jpg
i1222.photobucket.com/albums/dd486/cmaldridge/DSCF8656.jpg
i1222.photobucket.com/albums/dd486/cmaldridge/DSCF2813.jpg
Here's some more 400kv L2 pylons. I have no idea where these pylons head to.
i1222.photobucket.com/albums/dd486/cmaldridge/DSCF8663.jpg
Joining the other pylons.
i1222.photobucket.com/albums/dd486/cmaldridge/DSCF8659.jpg
All three lines heading from the power station. 400kv (left & right), 275kv (center).
i1222.photobucket.com/albums/dd486/cmaldridge/DSCF2814.jpg
Looking back from the power station. The pylons going off in different directions.
i1222.photobucket.com/albums/dd486/cmaldridge/DSCF2817.jpg
The terminal towers. The 275kv pylons start there in the field, but the 400kv pylons start back at the power station.
i1222.photobucket.com/albums/dd486/cmaldridge/DSCF2818.jpg
i1222.photobucket.com/albums/dd486/cmaldridge/DSCF2816.jpg
i1222.photobucket.com/albums/dd486/cmaldridge/DSCF8670.jpg
Enjoy!
Christopher